Charlevoix bridge cleaning May 22

The Michigan Department of Transportation (MDOT) will be cleaning the decks of the US-31 bascule bridge over the Pine River Channel in Charlevoix (map: https://bit.ly/2DrQ5xW).

This maintenance work involves removing road sand and salt from the structures to prevent corrosion.

Crews will be working on the Charlevoix bridge on Wednesday May 22.

From 7:30 a.m. to 3:30 p.m., the bridge will have single-lane closures with traffic shifts.

One lane will remain open in each direction at all times.

This work helps ensure the bridges can open and close safely and reliably.

Leave a Reply